I was clearing my leave when i receives SMS that a new project has been awarded and we were like call back to office a few days later. This leave me with another 4 days of leave to clear by end this month (impossible) and 9 days of leave to clear by end March 2011 (Also impossible).
But well, busy is better than slack. For those who dun understand my work, i generally work like how a student study in NUS. Starting 2 weeks is pure lecture, follow by tutorials then test & exam. Lastly graduate and go to work.
As for us, we have requirement gathering (aka meeting forever), or transition meetings for some cases. After that we have design phase where we design the system, then we start to develop the system. After developing the system (aka coding phase), we will start SIT (System Integrated Testing) which we test by ourselves or get someone in the company to test. Next, the user of the system will test, which we call UAT (User Acceptance Testing). After UAT, the users will list the bugs we need to fix and we will fix and let them do UAT again. Once all is ok, we prepare for implementation and the system roll out. If unlucky, we may have to do production support.
How has this link to studying in NUS.
The first 2 weeks of lectures are like our requirement gathering. Abit of notes-taking here and there, but dun need to study so much. At least still can KTV after school and slack abit. (Requirement Gathering)
When tutorial starts, we need to get our hands dirty and start working, but still nt that bad(Design stage)
Then we will start to mug for test & exam, where we burn midnight oil, study again & again, the part we hate most (Coding phase)
Before exam, we do some past year paper to make sure we are on the right track, studying the right thing (System Integrated Testing)
After exam, lecturers will mark the paper (User Acceptance Testing) and if you fail the paper, you need to do study again (Bug fixing) and prepare for sup-paper (UAT
round 2).
Once all is ok, we prepare for implementation (prepare for interview to go society to work) and do production support (Start working, which is boring like hell).
THE SAD THING IS...
In our line, coding & UAT is the most time-consuming piece of work.
In IT, we
code > UAT > bug fix > UAT > bug fix > UAT > bug fix..is the same as
study for exam > exam > fail & study > sup-paper > fail & study > sup-paper > fail & study..Now i'm in my 1st 2 weeks of "lectures"... but i starting to have difficulties absorbing wat the "lecturer" is saying... May have to study at night by myself. =(